top of page
Search

1 million tonnes disposed by rail for HS2

oschepisi

We are thrilled to announce a significant milestone achieved by our team working in collaboration with SCS Logistics and HS2. Together, we have have successfully disposed over 1 million tonnes of material sustainably by rail for HS2’s operations in London.


Our very own Graeme Murray, General Manager for Rail Logistics, recently showcased our work at Willesden Euroterminal on the HS2 YouTube channel. This video highlights the dedication and expertise that went into moving 1 million tonnes sustainably by rail and the key role played by our Rail Logistics IT System, BulkSmart.


Join us in celebrating this achievement and watch the video to learn more about our operations for HS2.




 
 
 

Comments


LIS white .png

CONTACT US:

SEND US A MESSAGE:

CONNECT WITH US

  • LinkedIn

Legge Infrastructure Services is a limited company registered in England and Wales. 

Registered No: 10675751

 

View our Privacy Policy here
 

Tel: 01636 626576

Email: contact@liservices.co.uk

1st Floor

49 High Street 

Hucknall

Nottinghamshire

NG15 7AW

Thanks for submitting!

bottom of page